cyclone
Aura Vent Ltd
cyclone Aura Vent Ltd
Request Quote
Service Protocols

Precision Engineering.
Atmospheric Control.

Aura Vent Ltd provides a closed-loop service lifecycle for residential ventilation—from initial site assessment and rigid ducting installation to Building Regs commissioning and ongoing lifecycle maintenance.

verified BESA CERTIFIED
architecture DESIGN SPEC ALIGNED
Protocol: SV-01
hvac

Installation Excellence

Complete mechanical ventilation with heat recovery (MVHR) system installation, executed strictly to architectural blueprints and airflow specifications. We use rigid ducting exclusively for performance stability.

Protocol Scope
  • check_circle Rigid ducting network assembly
  • check_circle Core unit mounting & vibration isolation
  • check_circle Sealed acoustic attenuation systems
SPECIFY PROJECT arrow_forward
Protocol: SV-02
tune

System Commissioning

Rigorous system calibration to ensure compliance with Building Regulations Document F, verifying design airflow rates are achieved at every terminal using calibrated anemometers.

Protocol Scope
  • check_circle Proportional balancing of all terminals
  • check_circle BPEC certified airflow validation
  • check_circle Building Control compliance certification
VERIFY SYSTEM arrow_forward
Protocol: SV-03
home_repair_service

Lifecycle Maintenance

Annual preventative maintenance to ensure continuous peak performance, mitigate mechanical wear, and maintain hygienic air quality standards for healthy residential living.

Protocol Scope
  • check_circle G4/F7 Filter hygiene inspection
  • check_circle Heat exchanger matrix sanitation
  • check_circle Motor integrity & current monitoring
BOOK SERVICE arrow_forward
Protocol: SV-04
engineering

Technical Audit

System troubleshooting and design audits for existing installations failing to meet air quality or acoustic expectations. We provide data-driven remediation strategies.

Protocol Scope
  • check_circle Acoustic vibration analysis
  • check_circle Air leakage & duct integrity testing
  • check_circle System design vs installation audit
REQUEST AUDIT arrow_forward
Operational Flow

The Aura Vent Protocol

01

Consultation

Reviewing architectural plans and establishing environmental targets.

02

Execution

Precision installation of core units and rigid ducting networks.

03

Validation

Calibrating airflow and issuing BPEC certified compliance reports.

Ready to engineer your environment?

Get a Technical Quote arrow_forward